19 April 2005 - 20 t (20 long tons; 22 short tons) of uranium and 160 kg (350 lb) of plutonium dissolved in 83 kl (2,900 cu ft) of nitric acid leaked over several months from a cracked pipe into a stainless steel sump chamber at the Thorp nuclear fuel reprocessing plant. The partially processed spent fuel was drained into holding tanks outside the plant.