June 1999 - Operators attempting to insert one control rod during an inspection neglected procedure and instead withdrew three causing a 15 minute uncontrolled sustained reaction at the number 1 reactor of Shika Nuclear Power Plant. The Hokuriku Electric Power Company who owned the reactor did not report this incident and falsified records, covering it up until March, 2007.